Quick start Guide
Installation Instructions
Download Printable Version:
Mounting the Base (T-slot Table)
-
Position the Anchor Point Base on a clean machine table.
-
Place the toe clamps opposite each other in the toe clamp slots and hand tighten the bolts.
-
Tighten up one of the bolts.
-
Run a dial indicator along any side edge and tap the Base until it is square with the machine table.
-
Once square, tighten the other bolt and then fully tighten the bolts to secure the anchor point to the table
Mounting the Base (SMW Fixture Plate)
-
Position the Anchor Point Base on the SMW plate with two dowel pins as illustrated in the image below . push the anchor point up against the dowel pins to make it square to the machine.
-
Place the toe clamps opposite each other in the toe clamp slots and tighten the bolts.
Mounting the Base (M8 Holes)
-
Position the Anchor Point Base on your custom base plate.
-
Install all 4 of the M8 screws and finger tighten them
-
Run a dial indicator along any side edge and tap the Base until it is square with the machine table.
-
Once square, tighten the other bolt and then fully tighten the bolts to secure the anchor point to the base plate
Mounting the Base (Lang/HWR/Rock-lock Studs)
-
Install pull studs into bottom of anchor point base.
-
Install in base.
Air Connections
-
The Anchor Point Base requires a minimum of 100 psi of compressed air to unlock the pallets. Use one of the included connectors ( 1/4" or 1/8" Bsp Push-to-connect tube fittings) to connect to your compressed air source.
-
Screw the slide valve into the port on the anchor point.
-
Screw the 1/8" elbow into the inlet of the slide value.
-
Connect a section of tubing from the air source to the push-to-connect elbow on the side valve.
Operation Instructions
Using the Anchor Point Pallet System
-
Unlock the Base by sliding the blue collar on the valve toward the anchor point.
-
Place a Pallet on the anchor point and slide the blue collar away form the Anchor Point. (Some binding is normal during the break-in period of new Pallets and Base.)
​
Machining/Using Pallets
-
Pallets are 6082-T6 plate Aluminum
-
Always machine fixtures with the Pallet locked on the Base.
-
If parts are to be bolted directly to the top of a pallet, start by face milling the top of the pallet to establish a consistent flatness.
-
The blank pallets supplied are made of saw cut plate so the raw edges may differ between pallets but they should all clean up to 101 x 101 x 28.5mm.
Maintenance Instructions
-
After each use - Clear chips, coolant and cutting oils. Install a blank pallet or Cover when not in use.
-
Every 36-48 hours-Apply a light coating of grease to the pins and bushings.
-
Every 300-400 hours-Apply a liberal coating of grease on the pull stud and actuate the clamp and unclamp 10-15 times to work the grease into the mechanism.